ELECTRICAL TESTING & COMMISSIONING INTERVIEW QUESTIONS

ELECTRICAL TESTING & COMMISSIONING INTERVIEW QUESTIONS


1.      C.T – MOS for Testing?
2.      What is CT Knee point voltage? What is the purpose of doing Knee point test?
3.      Explain about knee point curve using plot?
4.      How can you do polarity test in CT?
5.      Explain about IR, Polarity, Winding resistance with diagram?
6.      CT & VT Magnetizing current testing method
7.      V.T – MOS for Testing?
8.      What is the purpose of doing magnetizing current test in VT?
9.      Operating Principle of Transformer?
10.  What is meant by Magnetic flux?
11.  What do you mean by % Impedance?
12.  How to calculate % Impedance?
13.  What is the value of IR while testing Transformer at site?
14.  What is value of tolerance in short circuit impedance?
15.  What is the test procedure to test magnetic balance in transformer?
16.  What are tests to carry out in oil?
17.  How transformer differential stability will be carried out?
18.  What is the difference between no load current and magnetizing current in transformer?
19.  What is the procedure for doing Zero sequence Impedance test?
20.  a. What is trip time / Closing time of circuit breaker
       b. Why tripping time is lesser than closing time?
21.  Draw and explain IDMT characteristics?
22.  What are the curves in Relays?
23.  Relays time calculation formula.
24.  Explain the operation of Directional over current relay with diagram?
25.  What is the formula for relay timing test ( 2times)
26.  Explain TCS (pre-closed & post-closed) circuit with diagram.
27.  Backup Relay –Method of Testing
28.  How can you check synchronizing check
29.  Inter trip logics- Operations
30.  Explain about line protection differential scheme?
31.  a. Explain how load transfer to be done for double bus bar scheme.
b. During load transfer, If there is bus fault, bus coupler CB will trip (or) not.
32.  What is the initial charging current and final charging current for 1320AH battery of DC scheme?
33.  How do you check Synchronizing Scheme?
34.  How much distance between spark gap contacts?